A contractor working for the Town of Hopkinton in preparation for street resurfacing will be installing asphalt shim work beginning Wednesday May 22–Friday May 24 from 7am-5pm on the following streets.
Front St – Ash St to Clinton St.
Lumber St – 630’ south of West Main St to 3805’ south of West Main St.
Spring St – Pond St to the Upton town line.
Saddle Hill Rd – 750’ south of Equestrian Drive to 550’ north of Equestrian Drive
One lane of traffic will be open at all times.
Thank you,
Mike Mansir
Hopkinton Highway Manager